Consultation Hotline:

0512-52373588 0512-52378360

Contact

Changshu Hongqiao Cast Steel Co., Ltd
Contact: Manager Chen (13806233250)
Phone: 0512-52373588
            0512-52378360
Fax: 0512-52378350
Address: No. 3 Chentang West Road, Miaoquan Industrial Park, Guli Town, Changshu City, Suzhou City, Jiangsu Province

Company News

Warm Celebration of the Successful Trial Production of NOV (National Oil Well Huagao) Chain Wheel

Author: ComeFrom: Date:2015/10/15 Hits:70960
NOV(National Oilwell Varco),  Chinese translation: National Oil Well Huagao. Since 1841, NOV has been committed to ensuring that customers receive the highest quality oilfield products and services. With over 700 manufacturing, sales, and service centers worldwide, National Oilwell Varco focuses on customers and provides the best solutions that meet the quality, capacity, and environmental requirements of the energy industry. National Oilwell Varco is the world's largest drilling equipment manufacturer, offering a range of products including large mechanical components for both onshore and offshore drilling rigs, complete sets of onshore and workover rigs, pipe inspection and coating, drill string equipment, various lifting devices, as well as various downhole motors, drill bits, and tools. National Oilwell Varco also provides supply chain services through a network of distribution service centers located in major oil and gas producing areas around the world.
The quality requirements for the sprockets in the orders received by our company are high. The castings are subjected to non-destructive testing as a whole, and some areas are inspected according to EN12680-2 Level 2, EN1369 SM1-LM1-AM1, The maximum size of the casting is 2700mm, and the thinnest is 20mm, so controlling the casting to not deform is also a difficult point in production.
This project has been under negotiation since July this year. After the process design, mold making, casting, quality inspection and other steps, through the unremitting efforts of all employees of the company, two sets (4 pieces) were finally delivered to the customer on time by the end of September





















Previous:Nothing
Next:We warmly celebrate our company's acquisition of the Suzhou Marine Platform Casting Gearbox Engineering Technology Research Center